22.07.10
AFI KLM E&M Selected by Air Canada for GE90 Engine Maintenance - AFI KLM E&M announces that it has been selected by Air Canada for maintenance support of the airline's General Electric model GE90-110/115 engines that power its fleet of 18 Boeing B777-200LR and-300ER aircraft. The exclusive contract covers a wide scope of adaptive maintenance solutions from on-site / on-wing operations to shop visits, engine components, spare engine support and engine engineering over a period of 12 years.
AFI KLM E&M Selected by Air Canada for GE90 Engine Maintenance
20.07.10
Air Europa Chooses AFI KLM E&M to maintain A330, CF6-80E1 Engines - Air Europa signed an agreement with AFI KLM E&M for the maintenance of CF6-80E1 engines, equipping their A330 aircraft.
Air Europa Chooses AFI KLM E&M to maintain A330, CF6-80E1 Engines
16.07.10
LAN CARGO signs with AFI KLM E&M for Boeing 777 freighter component support and engine overhauls. - AFI KLM E&M has won a component support contract for LAN CARGO Boeing 777 freighters and for the overhaul of their GE90-110 engines. Agreed in the framework of the Boeing 777 CSP partnership, the Components contract includes repairs for aircraft and engine components and pool access for routine replacements. The Engines contract was signed on a flight-hour basis with access to spare engines.
LAN CARGO signs with AFI KLM E&M for Boeing 777 freighter component support and engine overhauls.